Dacopan project MEETING MINUTES
May 17th, 2004
Meeting
May 17th, 2004, at 13:30.
Room 138
Petrozavodsk State University
Lenin st. 33, Petrozavodsk
Attendance
Kirill Kulakov, group leader
Andrey Ananin, secretary
Viktor Surikov
Mikhail Kryshen
Dmitry Korzun, instructor
Absent
Andrew Salo
1. Start
Mr. Kulakov started the meeting at 13:30.
2. Assessment of the situation
Implementation should be freezed as soon as possible,
documentation should be checked and product should be
ready for the presentation to the customer.
3. Discussion
* Implementation and testing
The group discussed current problems with the Analyzer:
- there are still some bugs in the analyzer:
ARP packets should be mobed on other level,
bug in the Message mapper (ptu->link is not right in some cases).
- Information about the Analyzer copyright should be included.
- Version of the Analyzer is 1.0 now.
* Analyzer documentation and other issues
- Code should be checked.
- Test execution document should be filled in final way.
- Test plan should be fixed.
- Implemenation document inspection.
- Manual page for the Analyzer should be done.
4. Action points
Mr. Ananin: responsible for the manual page structure.
Mr. Kryshen: start writing installation and PEF sections of the User Guide (man page),
add source information, check the Implementation document.
Mr. Kulakov: fix bug in the Message mapper, fix the version of the Analyzer,
check the Implemetantion document, fix test plan,
start writing the general description section,
ask H-group about product presentation to the Mr. Kojo (DEADLINE!!!).
Mr. Salo: check the whole code of the Analyzer,
corresponding part of the user guide.
Mr. Surikiv: fix the bug with ARP packets,
correpsonding part of the user guide,
check the Implementation document.
5. End