Dacopan project MEETING MINUTES
Feb 26th, 2004
Meeting
Feb 26th, 2004, at 15:30.
Room 307
Petrozavodsk State University
Anohina st. 20, Petrozavodsk
Attendance
Kirill Kulakov, chairman
Andrey Salo, secretary
Andrey Ananin
Mikhail Kryshen
Viktor Surikov
Absent
Dmitry Korzun, instructor
1. Start
Mr. Kulakov started the meeting at 15:30.
2. Assessment of the situation
Inspection of Project Plan and Requirements Specification documents.
3. Discussion
3.A - Project planning
Mr. Kulakov starts discussion about Project Plan document.
Other team members tell about minor fixes in the document.
Mr. Kulakov claims that TWiKi website link in section
"Organization" is too long. Local schedule question is still
unclear.
Results:
- The Project Plan document is almost completed.
3.B - Requirements specification
Mr. Kulakov starts discussion about Requirements Specification
document. Section "Introduction" seems to be too short. It was
decided to discuss this problem using forum. Section "User
requirements" - "Analyzer" needs to be fixed. Question about
Animator configuration is unclear. Networking scenarios
implementation priorities are discussed. Section "System
Requirements" - "Analyzer" is still unfinished. Section
"Non-functional requirements" is discussed.
Results:
- The Requirements Specification document is finished to 70%.
- The deadline has passed, but the document is still
unfinished.
- "The schedule of the project isn't met" risk is going
to be materialized.
- One additional week is needed to finish the document.
4. Action points
- Each team member: control document terms accordance to glossary,
continue working on Analyzer system requirements.
- Mr. Ananin: fix section "User requirements" (RS), control of use
cases.
- Mr. Kryshen: network scenarios control, discuss Animator
configuration questions in forum, intermediate file format
questions.
- Mr. Kulakov: control local & global schedule questions,
responsibility for section "Introduction" (RS).
- Mr. Salo: section "System constraints" (RS) control, section
"Non-functional requirements" (RS) control.
- Mr. Surikov: textual description of high-level architecture,
high-level architecture model minor fixes.
5. End
Mr. Kulakov ended the meeting at 16:30.